Water finds every weak joint in a bathroom, so bathroom remodeling starts behind the wall, not on the surface. At Majestic, a project lead opens the plan with measurements. These cover the room, the drain location and the plumbing and electrical runs. Next, we choose the shower, vanity and tile to fit that layout. A shower floor needs to slope a quarter inch per foot toward the drain. We check that slope before any tile goes down. However, we price the work only after we see the room, because hidden rot or old pipes change the scope. You get the plan in writing before demolition begins.
The right bathroom remodeling scope depends on your layout, your budget and what sits behind the walls and under the floor. We tell you which one fits after we measure the room.
Frameless glass, tiled benches and niches, or a new tub, built on a sloped and waterproofed base.
Single or double vanities sized to the room, with soft-close drawers and counters in quartz or laminate.
Porcelain or glass tile set over a waterproof layer, with grout sealed so water has no path into the wall.
Demolition, plumbing, electrical, ventilation and finishes under one project lead and one schedule.
Four things we do differently on every bathroom remodeling project.
The project lead who walks your bathroom runs the job. Details do not get lost between the estimate and the install. We check the finished work against the plan with you before we close out.
A shower floor needs a quarter inch of slope per foot toward the drain. We check the slope and the membrane seams before tile goes down. A leak behind finished tile means tearing the work out.
The National Electrical Code requires a 20 amp circuit for bathroom receptacles, and those outlets need GFCI protection. We also plan the exhaust fan with the layout, since steam with nowhere to go feeds mold.
We list what the estimate includes, from demolition to final trim, so you can compare bids line by line. If you change the scope, we write the change down before work continues.
Five reviews from our clients, unedited: solar, financing, roofing and electrical work.
Exceptional service! The team at Majestic went above and beyond to install my solar panels. Couldn’t be happier with the results.
Majestic truly exceeded my expectations. Their solar financing options made it easy for me to go green without breaking the bank.
Highly recommend Majestic for their professionalism and expertise. They did an outstanding job with my roofing installation.
Impressed by their attention to detail and efficiency. The electrical panel service they provided was top-notch. Will definitely use them again!
I had my home rewired by Majestic and couldn’t be more pleased with the results. The team was courteous, knowledgeable, and efficient.
Exceptional service! The team at Majestic went above and beyond to install my solar panels. Couldn’t be happier with the results.
Majestic truly exceeded my expectations. Their solar financing options made it easy for me to go green without breaking the bank.
Highly recommend Majestic for their professionalism and expertise. They did an outstanding job with my roofing installation.
Impressed by their attention to detail and efficiency. The electrical panel service they provided was top-notch. Will definitely use them again!
I had my home rewired by Majestic and couldn’t be more pleased with the results. The team was courteous, knowledgeable, and efficient.
Tell us about your bathroom remodeling plans and what you want to change. We’ll come out, measure the room and look at the walls, plumbing and electrical. Then we tell you what is worth doing and what isn’t.
The fastest way to book is a call or an email. Tell us your address, the bathroom you want to change and a good time to reach you.
Tile and grout are not waterproof on their own, because water passes through grout joints. A membrane behind the tile does the real work. It carries water down the sloped floor to the drain instead of into the framing. The National Kitchen & Bath Association publishes planning guidelines for bathrooms on the NKBA website. Floors matter too, so our flooring team can set floor tile or a water-resistant plank, depending on the room. Planning a kitchen in the same project? See our kitchen remodeling page. For whole-house work, start at home remodeling. Either way, a crew member checks the slope with a level before tile goes down.
A bathroom remodel runs in five stages, and each one ends with a check before the next begins. First, we measure the room and agree on the layout. Next, the crew demolishes the old bathroom, then roughs in plumbing and electrical. Those lines must sit inside the walls before the shower base goes in. After that, waterproofing, tile, vanity and fixtures go in, in that order, since each layer depends on the one beneath. Last, we walk the finished bathroom with you and write down any touch-ups. Our electrical team covers panel upgrades when new circuits need more capacity. Ready to start? Book a free bathroom estimate and we will walk the room with you.
Bathroom remodeling covers the work between an old bathroom and a new one. That usually means measuring and layout, demolition, plumbing and electrical rough-in, waterproofing, tile, a new shower or tub, a vanity, lighting and final trim. Some projects change the layout and move a drain. Others replace only the shower and the fixtures. For that reason, we scope each project from the room itself. During the free estimate, we walk the bathroom with you, note what stays and what goes, and flag anything behind the walls that could change the work. Then we write the scope down so you can see what each line covers.
The timeline depends on the scope, the size of the room and how long materials take to arrive. Replacing a vanity and fixtures moves faster than a full renovation that opens walls and moves plumbing. Custom glass and special tile also add lead time, because they are ordered or cut to your measurements after the layout is final. For that reason, we do not quote a number of days before we see the room. Instead, we give you a working schedule in writing after the estimate, and we update it if a hidden problem, such as rot behind an old tub, turns up during demolition.
Often, yes. The tub comes out, the floor gets a new slope toward a drain, and the wall behind it gets a waterproof layer before tile. It works when the plumbing can reach the new drain location and the floor framing is sound. However, if the framing is soft or the drain sits far from the wall, the job grows, and we tell you before you decide. In that case, we price a new tub and a walk-in shower side by side. You compare the two on cost and on how each changes the room, then you choose. We leave the decision with you.
The choice depends on the look you want and how much upkeep you accept. Porcelain resists water and stains, so it suits shower walls and floors. Glass tile wipes clean but shows every flaw in the wall behind it. Natural stone looks rich, yet it needs sealing from time to time. Small tiles on a shower floor grip better underfoot, because they add more grout lines. We bring samples to the estimate so you can see them in your own light. Then we plan the tile layout, the niche and the trim with you before materials are ordered.
It depends on the work. Swapping a vanity, a toilet and fixtures in place often needs no permit. Moving plumbing, adding circuits or changing walls usually does. Each city and county sets its own rules, so we check yours during the estimate, before work starts. When a permit applies, we pull it and schedule the required inspections. Inspectors check the electrical and plumbing before the walls close, so the order of work matters. If you are unsure whether a past bathroom job was permitted, tell us, because it can affect a sale or an insurance claim later.
Most homeowners do, but the bathroom is out of use for part of the project. During demolition and rough-in, you will have no shower or sink in that room, and dust travels. We seal the work area with plastic and keep a clear path to the door. If your home has a second bathroom, that one carries the load for the family. Because water gets shut off at times, we tell you the day before. If your household includes infants or people with breathing problems, we talk through staying elsewhere for the messiest days.
We start with who uses the room, how they use it and what you store. Then we place the toilet, vanity and shower so doors, drawers and walking paths do not collide. We also check door swings, drawer reach and the spot where a towel hangs within reach of the shower. Because drains and vent stacks cost a lot to move, we keep fixtures near the existing plumbing wherever the layout allows. You see the drawing before anything is ordered, and you can change it. Small shifts at this stage cost far less than changes after install.
Usually, yes, because the walls are open and the work costs less now than later. The National Electrical Code requires a 20 amp circuit for bathroom receptacles, and those outlets need GFCI protection. Steam also needs a way out, so we size an exhaust fan that vents to the outside, not into the attic. We check your panel during the estimate to see if it has room for new circuits. If it does not, our electrical team can upgrade it as part of the same project. You get one schedule and one point of contact.
Book a free estimate by phone or by email. First, we ask about your goals, your timeline and the problems you want solved. Next, a project lead visits, measures the room and looks at the plumbing, electrical and walls. Then we send a written scope and price. Photos, magazine pages or product links are welcome at the visit, and we turn them into a layout. You are under no obligation after the estimate. If you want to move ahead, we agree on a start date and order materials only after you approve the plan.