Most home remodeling problems start behind the drywall. Old wiring, undersized drains and out-of-level floors all surface once demolition begins. For that reason, we visit your house first and measure every room. Then we draw the new layout in 3D, so you can compare options before any money goes into materials.
Our crew handles structural changes, permits, electrical, plumbing, flooring and windows under one plan. In addition, a project manager sends a progress update every week. Homes built before 1978 may contain lead paint, so we follow the lead-safe work rules the EPA sets for them. That planning is what makes home remodeling predictable, even in an older house.
Every house is different. After the visit, we tell you which home remodeling scope fits your budget and which work can wait.
Layout changes, new finishes and updated systems planned as one project, so trades do not undo each other’s work.
Cabinets, counters, lighting and appliance circuits laid out around how you cook.
Demolition, waterproofing and fixtures, with the shower floor sloped to drain.
New floors, tile and trim that match the rest of the remodel and go in last.
Four habits that keep a home remodeling job on schedule.
Hidden problems cost the most when they appear mid-project. Opening a small section first lets us see the wiring, pipes and framing. Then your estimate reflects the house you actually have.
Plumbers, electricians and tile setters work in a set order. If one trade runs late, the next one waits. Our project manager sequences them and shares an update each week.
A new kitchen layout needs outlets spaced so no point on the counter sits more than 24 inches from one. We plan the circuits before cabinets go in, because moving a wire later means opening finished walls.
We keep the work area swept, protect floors you are keeping, and answer budget questions in plain numbers. You see cost tracking each week, so the final bill holds no surprises.
Five reviews from our clients, unedited: solar, financing, roofing and electrical work.
Exceptional service! The team at Majestic went above and beyond to install my solar panels. Couldn’t be happier with the results.
Majestic truly exceeded my expectations. Their solar financing options made it easy for me to go green without breaking the bank.
Highly recommend Majestic for their professionalism and expertise. They did an outstanding job with my roofing installation.
Impressed by their attention to detail and efficiency. The electrical panel service they provided was top-notch. Will definitely use them again!
I had my home rewired by Majestic and couldn’t be more pleased with the results. The team was courteous, knowledgeable, and efficient.
Exceptional service! The team at Majestic went above and beyond to install my solar panels. Couldn’t be happier with the results.
Majestic truly exceeded my expectations. Their solar financing options made it easy for me to go green without breaking the bank.
Highly recommend Majestic for their professionalism and expertise. They did an outstanding job with my roofing installation.
Impressed by their attention to detail and efficiency. The electrical panel service they provided was top-notch. Will definitely use them again!
I had my home rewired by Majestic and couldn’t be more pleased with the results. The team was courteous, knowledgeable, and efficient.
Tell us which rooms you want changed. We visit, measure and walk you through the scope and what drives the cost. Then you decide what is worth doing.
Call
Hours
Sunday to Thursday 9am to 5pm · Friday 9am to 1pm
The fastest way to start is a call or an email. Tell us the rooms, your address and when you would like us to visit.
A remodel changes more than looks. Moving a wall shifts structural loads, and moving a sink changes how a drain slopes. Studs usually sit 16 inches apart, so a wall that carries roof weight needs a beam sized for its span before it comes out. Drains also need a steady downward slope, and each electrical circuit has a load limit. As a result, we plan the structure, drains and wiring before anyone picks tile or paint.
The EPA explains lead-safe renovation for homes built before 1978 on its renovation, repair and painting program page. If you also want better comfort, pair the remodel with window installation or energy efficiency upgrades. Planning those links first keeps home remodeling from opening the same wall twice.
Each stage ends with a check before the next one begins. Because your project manager sends a weekly update, you always know which stage is current.
01 Visit and measure. We walk the house, measure each room and talk through how you use it. Then we draw the layout in 3D.
02 Scope and permits. We list what we find in the walls and pull the permits that structural, electrical and plumbing changes need.
03 Demolition and rough-in. After demolition, framing, plumbing and wiring go in. Inspectors check this work before the walls close.
04 Finishes. Drywall, tile, cabinets, flooring and paint follow in the order that keeps new surfaces clean.
05 Final walkthrough. We walk every room with you and fix the punch list before we close the job.
Home remodeling covers any project that changes how a house looks, works or flows. That can mean moving a wall, opening a kitchen to the dining room, replacing a bathroom, or updating the floors, lighting and windows. Some work is cosmetic, like paint and trim. Other work changes structure, drains or wiring, and those changes need planning first. We sort the scope into those two groups at the visit, so you see what affects the budget and what can wait. Knowing the split early keeps the estimate honest, because structural and plumbing changes usually cost more than finish work and they set the order for everything else.
A single room, such as a bathroom, often takes several weeks once work starts. Whole-house projects usually run several months, and the timeline depends on how many walls move, what the inspectors need to see and how quickly materials arrive. Older houses can add time when wiring or drains need updating, because those problems often appear only after walls open. We give you a schedule after the visit, with each stage marked, and your project manager updates it every week. If the plan changes, you hear about it before the crew moves on to the next stage, not after.
Often, yes. Most cities and counties require permits for structural changes, electrical work, plumbing changes, and some window or roof replacements. Rules vary by jurisdiction, so we confirm what your address requires before we start demolition. A permit brings inspections, which check framing, wiring and drains while they are still visible. We pull the permits for the work we do and coordinate the inspection schedule with the crew, so the walls do not close before an inspector has seen them. Cosmetic work such as paint or new cabinets usually needs no permit, although we confirm that for your specific project first.
Scope is the first driver: how many rooms change and whether walls move. Next come the hidden conditions. Old wiring, undersized drains, rotten framing and lead-safe work all add cost once they are found, which is why we open a small section before final pricing. Material choice matters too, from tile and cabinets to windows and flooring. Permits, inspections and the number of trades also shape the budget. We break the estimate into those categories, so you can see which choice moves the total and which one you can change without touching the structure.
Often, yes, if the work is limited to one area. A kitchen or bathroom remodel usually leaves the rest of the house usable, though you may need a temporary sink or a simple kitchen setup. Whole-house projects are harder. Dust, noise and shut-off water or power can make full-time living difficult, so we plan the schedule around your needs. We keep the work area sealed and swept each day, protect floors you are keeping, and tell you ahead of any day that water or power will be off. We walk through your plan together before work begins.
Start behind the walls, not on the finishes. In an older house, the first items to check are the electrical panel and wiring, the drains and supply lines, the framing under any wall you plan to move, and the condition of the subfloor. These systems set what you can do with the layout. Once they are known, you can choose tile, cabinets and paint without worrying that the new surface will need to come off. We recommend a visit and measurement first, so the plan reflects the house you actually have.
If your home was built before 1978, it may contain lead paint, and remodeling can release lead dust. EPA rules require certified firms to follow lead-safe work practices on this kind of job, including containing dust, cleaning the work area and avoiding dry sanding or open-flame burning of paint. We follow those rules on pre-1978 homes. Before work starts, we explain how we will protect your household, what the containment looks like, and when the area is cleared. Testing can confirm whether lead is present, so the plan matches the house.
Yes. Many clients start with a single kitchen, bathroom or laundry room. A one-room project still needs the same planning as a larger job: we check the wiring, drains and framing in that room, and we confirm what the permit requires before demolition. Single-room work can also set up later phases. For example, if we plan the kitchen electrical circuits now, the rest of the house can be updated later without reopening the new walls. Tell us which room and what is bothering you, and we will explain the scope, cost drivers and timeline.
We stop, document the problem, and explain what it changes. Common finds include corroded supply lines, undersized or sagging drains, damaged framing, outdated wiring and water stains from past leaks. Each one has a repair, and we give you the options and cost before the crew moves on. Small fixes can go ahead with your approval under the existing scope. Larger changes go into a written change order with the new price and schedule effect. Nothing gets covered up until you have seen the problem and agreed to the fix.